Design partners

Bring the site, the load and the constraint.

We work with a small number of organisations in each market, closely, on deployments where the constraints are real and specific.
How it works
  1. 01
    Survey

    We look at the site: available power, thermal route, floor loading, network, access. Constraints first.

  2. 02
    Sizing

    The workload determines the configuration. Models, precision, context, concurrency — then the machine.

  3. 03
    Design

    Elevation, power topology, cooling loop and envelopes issued as a drawing set before anything is committed.

  4. 04
    Build and commission

    Assembled, imaged, installed and accepted under load, with instrumentation verified against the reporting schema.

You will speak to an engineer. Nobody here works on commission.

What to bring

The constraints, before the requirements.

A specification written before the site has been surveyed usually describes a machine that cannot be installed. These are the things that decide the design.

Bring what you have
Available powerWhat the board can actually give youSpare capacity, phases, and whether a new supply is on the table
Thermal routeWhere the heat goesAn existing loop, a condenser location, or nothing yet
SpaceRoom, floor loading, accessIncluding the route from the loading bay
WorkloadModels, precision, context, concurrency
Operating systemLinux, Windows, or both
ObligationsReporting, procurement and audit you already carry
TimingWhen the space and the budget exist