Design partners
Bring the site, the load and the constraint.
We work with a small number of organisations in each market, closely, on deployments where the constraints are real and specific.
How it works
- 01Survey
We look at the site: available power, thermal route, floor loading, network, access. Constraints first.
- 02Sizing
The workload determines the configuration. Models, precision, context, concurrency — then the machine.
- 03Design
Elevation, power topology, cooling loop and envelopes issued as a drawing set before anything is committed.
- 04Build and commission
Assembled, imaged, installed and accepted under load, with instrumentation verified against the reporting schema.
You will speak to an engineer. Nobody here works on commission.
What to bring
The constraints, before the requirements.
A specification written before the site has been surveyed usually describes a machine that cannot be installed. These are the things that decide the design.
| Available power | What the board can actually give youSpare capacity, phases, and whether a new supply is on the table |
|---|---|
| Thermal route | Where the heat goesAn existing loop, a condenser location, or nothing yet |
| Space | Room, floor loading, accessIncluding the route from the loading bay |
| Workload | Models, precision, context, concurrency |
| Operating system | Linux, Windows, or both |
| Obligations | Reporting, procurement and audit you already carry |
| Timing | When the space and the budget exist |